← The playground
Site logistics explorer
Choose an access route. Move the laydown area. Follow the delivery.
Build something like this ↗Office structureDetailed site model · Real-time 3D
Run deliveries
Drag to orbit · right-drag to pan · scroll or pinch to zoom
East access runs beside the crane. Deliveries continue to the rear of the building.
Demonstration model
Scripted vehicle paths for exploration, not capacity, swept-path or collision analysis.
Explore the other demos ↗